Case Study
When the Sussex DoP Rises project in Bexhill-on-Sea began, the goal was clear: ensure the new hospital's water infrastructure met the highest standards. Utility Solutions Provider Ltd was entrusted with this critical task, delivering the project seamlessly within one month in August 2024.
1 Month
Delivered the fully operational water network system within one month, meeting tight deadlines.
100%
Achieved 100% compliance with NRSWA, LRQA, and local authority standards, with zero issues raised during audits.
140 Metres
Successfully installed 140 meters of 180mm barrier pipe with precision and efficiency.
The Goal
The goal was to install, test, and commission a compliant and reliable water network system for the new hospital at Sussex DoP Rises, ensuring seamless integration with existing infrastructure.
The Solution
The solution was to plan, install, test, and commission a 140m, 180mm barrier pipe water network system with full compliance, minimal disruption, and timely delivery.


The RESULTS
The water network system was installed, tested, and commissioned without delays or setbacks. The project met all compliance requirements, earning high praise from the client and stakeholders.
What Made the Difference
Utility Solutions Provider’s meticulous planning, strict compliance with regulations, and commitment to delivering high-quality work on time made the difference in ensuring the project's seamless completion and stakeholder satisfaction.