When the Sussex DoP Rises project in Bexhill-on-Sea began, the goal was clear: ensure the new hospital's water infrastructure met the highest standards. Utility Solutions Provider Ltd was entrusted with this critical task, delivering the project seamlessly within one month in August 2024.

1 Month

Delivered the fully operational water network system within one month, meeting tight deadlines.

100%

Achieved 100% compliance with NRSWA, LRQA, and local authority standards, with zero issues raised during audits.

140 Metres

Successfully installed 140 meters of 180mm barrier pipe with precision and efficiency.

The Goal

The goal was to install, test, and commission a compliant and reliable water network system for the new hospital at Sussex DoP Rises, ensuring seamless integration with existing infrastructure.

The Solution

The solution was to plan, install, test, and commission a 140m, 180mm barrier pipe water network system with full compliance, minimal disruption, and timely delivery.

  • Pre-Construction Consultation: Engaged stakeholders through meetings to secure NRSWA compliance and CAD drawing approvals.
  • Installation: Laid 140m of 180mm barrier pipe using an open trench method.
  • Testing & Certification: Conducted rigorous testing, chlorination, and auditing. Compliance checks by LRQA and the local authority reported zero issues.
  • Documentation: Provided detailed photographic evidence, test certifications, and as-laid drawings for internal O&M manuals.

The RESULTS

The water network system was installed, tested, and commissioned without delays or setbacks. The project met all compliance requirements, earning high praise from the client and stakeholders.

  • Pre-Construction Planning: Ensured NRSWA compliance and stakeholder alignment.
  • Efficient Installation: Laid 140m of 180mm barrier pipe to high standards.
  • Testing & Handover: Completed testing, audits, and documentation with zero issues.

What Made the Difference

Utility Solutions Provider’s meticulous planning, strict compliance with regulations, and commitment to delivering high-quality work on time made the difference in ensuring the project's seamless completion and stakeholder satisfaction.