As the Crowne Plaza East Midlands Airport prepared to upgrade its facilities, the EV charger installation required precise delivery and no room for delays. The goal was clear - install a fully compliant, future-proof EV charging solution to the highest standards. Utility Solutions Provider Ltd delivered this project smoothly and efficiently, completing the installation ahead of expectations.


I couldn't be more delighted with the delivery and installation of our five new 22kw Autel electric vehicle chargers at our Crowne Plaza East Midlands Airport Hotel. From the moment we engaged with Utility Solutions Provider Ltd, we experienced nothing short of an exceptional service - a true masterclass in project delivery from start to finish.

Jeremy Pick

Managing Director, Yew Lodge Limited, Crowne Plaza East Midlands Airport. 

100%

Compliance with all relevant industry and local authority requirements, including BS7671:2019

10 Bays 

Delivered 10 fully operational 22kw AC chargers

 

80 Meters

Successfully excavated an 80m route for cable installation, laying 150mm and 63mm ducting


The Goal

To provide a modern, efficient EV charging solution for employees, customers, and guests, delivering 10 active bays with 22kW AC chargers to support sustainable travel and enhance the hotel’s amenities.


The Solution

The solution was to get USP to deliver the full EV charger installation at the Crowne Plaza, East Midlands Airport, Kegworth Yew Lodge, installing Autel Maxi Charger AC Ultra units capable of delivering up to 22kW AC power, complete with smart charging functionality and multiple payment options.

  • Site Preparation: Notifying the DNO of the new installation, and ensuring all health and safety requirements are met
  • Civil Works: Excavating an 80m route for cable installation, laying 150mm and 63mm ducting, forming concrete pads for charger pedestals, and reinstating all excavations
  • Electrical Installation: Pulling 35mm 5-core SWA and CAT 5E cables from the mains room to the feeder pillar and chargers and installing a 7-way 100A TPN Proteus panel with comms equipment
  • Testing and Commissioning: Conducting full testing, labelling, and commissioning of chargers in compliance with BS7671:2019 standards
  • Final Steps: Ensuring the site is clean and tidy, and liaising with the client to confirm satisfaction with the installation

The RESULTS

The project was successfully completed in a single visit, achieving the installation of 10 active EV charging bays equipped, all carried out efficiently and to a high standard.

  • Pre-Construction Planning: Coordinated access, traffic management, to ensure a smooth installation with minimal disruption to operations.
  • Testing & Handover: All units were tested, labelled, and complied with BS7671:2019 standards and handed over ready for use.
  • Efficient Installation: The team installed 10 bays with 22kW chargers in a single visit, completing civil and electrical works efficiently.

What Made the Difference

Thorough preparation, clear communication, and strong on-site coordination ensured the installation was delivered smoothly and without disrupting hotel operations. By managing every stage of the process - from planning to electrical installation and commissioning - the team delivered a dependable, high-quality charging solution that enhanced the hotel’s facilities and maintained full confidence among stakeholders.